November 2011

The move to the NVR took place in November and involved a wall being demolished and about 60 ft of track being laid to reach the car park. The railbus was driven on and off the low loader; the furthest it had moved under its own power in over 20 years. All this was done on half a tank of diesel still in there from the last time she was at the NVR!

railbusmove1 railbusmove2